Notice: We request that you don't just set up a new account at this time if you are a previous user.
If you used to be one of our moderators, please feel free to reach out to Chris via the facebook Outerlimits4x4 group and he will get you set back up with access should he need you.
If you used to be one of our moderators, please feel free to reach out to Chris via the facebook Outerlimits4x4 group and he will get you set back up with access should he need you.
Recovery:If you cannot access your old email address and don't remember your password, please click here to log a change of email address so you can do a password reset.
Strong GU Steer box pitman arm
Strong GU Steer box pitman arm
I'm after anyone interested in plate or billet steel pitman arms for the GU KOYO 104 drop pitman arm. The winch challange bous are breaking them and as I'm building a winch truck for some one will be looking into getting some pitman arms machined.
If I can get conformation on interest or purchace of said pitman arms I can get quotes on a batch. The more arms the better the price.
These will be a tough grade alloy steel folded or cut from billet steel and machined with tapers and spline as a direct bolt on replacement.
If I can get conformation on interest or purchace of said pitman arms I can get quotes on a batch. The more arms the better the price.
These will be a tough grade alloy steel folded or cut from billet steel and machined with tapers and spline as a direct bolt on replacement.
interested
Hey mate,
I would be interested in maybe 3, just depends on price.
Let me know, Cheers Heath
I would be interested in maybe 3, just depends on price.
Let me know, Cheers Heath
Has any tests been done to see what the brakeing point is of the the main shaft, it would be pointless upgrading the pitman arm if the main shaft is near breaking point when a standard GU pitman arm snaps, we have a sponsored truck that bends his GU sector shaft fairly often .
Its a lot easier to carry/replace a pitman arm than replace a steering box. Normal story you upgrade a weak point it goes to the next weak link.
Not being negative just a process that should be done otherwise myself and others could waste money on a product that makes little or no difference .
If you have done the research on the steering box than i may be interested as well.
Also do you know what "alloy" these are to be manufactured from and are they being properly heat treated?
Its a lot easier to carry/replace a pitman arm than replace a steering box. Normal story you upgrade a weak point it goes to the next weak link.
Not being negative just a process that should be done otherwise myself and others could waste money on a product that makes little or no difference .
If you have done the research on the steering box than i may be interested as well.
Also do you know what "alloy" these are to be manufactured from and are they being properly heat treated?
+++++NOW ON FACEBOOK++++++
www.superiorengineering.com.au
Largest 4x4 online superstore
SPONSOR OF TOUGH TRACKS
DGR RACE TEAM
JOOMBIE RACING
AMADA XTREME RACE TEAM
MAYBELINE RACING
MMM RACING
www.superiorengineering.com.au
Largest 4x4 online superstore
SPONSOR OF TOUGH TRACKS
DGR RACE TEAM
JOOMBIE RACING
AMADA XTREME RACE TEAM
MAYBELINE RACING
MMM RACING
they will be properly manufactured. I haven't decided what grade steel yet, I havent had time to do anything about it yet either. I will take a pitman arm off this week end and take it to one of the machine shops I used to work at and get a quote.
These will be CNC machined on a 4 or 5 axis machine centre, Hence getting the numbers.
These will be CNC machined on a 4 or 5 axis machine centre, Hence getting the numbers.
Are we talking pitman arm or the sector shaft?? It's the sector shaft that twist not the arm itself. I would only be interested in sector shafts, the shaft in the box the pitman arm splines and bolts to. I've never seen a pitman arm fail but we have 1/2 a dozen with twisted shafts at work from our comp trucks.
Cheers
Joel
Cheers
Joel
-Pre trip inspections/ servicing
-Suspension/ custom modifications
-4wd Dyno & tuning
-Qualified mechanics
-Suspension/ custom modifications
-4wd Dyno & tuning
-Qualified mechanics
Yes Pete that was the Idea, would have been optional on top or bottom taper or straight through hole.
I have seen plenty of GQ sector shafts break, never a GU yet. I'm not saying that they don't just I havent seen one.
I have heared of alot of guys breaking GU pitman arms though, in the same place, in the middle of the drop. If some one had a sector shaft out I could take it with me for a Quote. I dont want to strip my steer box down that far.
I have seen plenty of GQ sector shafts break, never a GU yet. I'm not saying that they don't just I havent seen one.
I have heared of alot of guys breaking GU pitman arms though, in the same place, in the middle of the drop. If some one had a sector shaft out I could take it with me for a Quote. I dont want to strip my steer box down that far.
bent sector shaft
Hey mate,
I have got a bent sector shaft you have have a look at. Just let me know.
Cheers Heath
I have got a bent sector shaft you have have a look at. Just let me know.
Cheers Heath
I bent 2 at the Ateco, we have bent 2 in the Suzuki, GQHOON bent one at the outback, I know Trent lean broke one at round one, I beleive Andreww Cassar has bent at least one and every one was a GU box.
The sector shaft is a big problem! I'll bet there are a heap more out there too.
Joel
The sector shaft is a big problem! I'll bet there are a heap more out there too.
Joel
-Pre trip inspections/ servicing
-Suspension/ custom modifications
-4wd Dyno & tuning
-Qualified mechanics
-Suspension/ custom modifications
-4wd Dyno & tuning
-Qualified mechanics
Pitman arms will be a no go, as they are forged and a better grade of steel would need to be profiled and inturn become to hard for conventional machining, thus too expensive.
Sector shafts will be around the $1000 mark minimum order of 10 (hopefully cheaper), I have not had a conformation on heat treatment cost yet.
Sector shafts will machined from 4340 or E110 and heat treated to suit.
They will be machined on a Mazak itergrex 200y, there is alot of 5 axis machining required on the gear section as they are tapered and crowned on the tooth face. A large peice of bar is also required to get the diametre for the gear.
Anyone interested will need to pay before the shafts are machined, I will not put any sort of warrenty on these nor be responsable for any damage caused be a failure, not that it is likely.
Just for the record I don't want any of these sector shafts nor will I be making a profit out of it. They will be made as a good will gesture to the hardcore winch challange, OBC and cliffhanger competitors (or anyone else) and will be used at your own risk. These will be the first or only batch done, depending on numbers maybe not done at all, hence no testing has been done, but if your damaging genuine parts whats the alternative aside from full hydro?
I look at it as common interest is a sport and helping people that help us with advice and knowlage.
I have not priced a genuine sector shaft but am lead to beleive they are around the same purchace price, if anyone would like to try better the price or offer an alternative feel free. Like I said I'm not fussed either way.
Steve.
Sector shafts will be around the $1000 mark minimum order of 10 (hopefully cheaper), I have not had a conformation on heat treatment cost yet.
Sector shafts will machined from 4340 or E110 and heat treated to suit.
They will be machined on a Mazak itergrex 200y, there is alot of 5 axis machining required on the gear section as they are tapered and crowned on the tooth face. A large peice of bar is also required to get the diametre for the gear.
Anyone interested will need to pay before the shafts are machined, I will not put any sort of warrenty on these nor be responsable for any damage caused be a failure, not that it is likely.
Just for the record I don't want any of these sector shafts nor will I be making a profit out of it. They will be made as a good will gesture to the hardcore winch challange, OBC and cliffhanger competitors (or anyone else) and will be used at your own risk. These will be the first or only batch done, depending on numbers maybe not done at all, hence no testing has been done, but if your damaging genuine parts whats the alternative aside from full hydro?
I look at it as common interest is a sport and helping people that help us with advice and knowlage.
I have not priced a genuine sector shaft but am lead to beleive they are around the same purchace price, if anyone would like to try better the price or offer an alternative feel free. Like I said I'm not fussed either way.
Steve.
I just assemble machinery now days so dont have access to a spectro analyser, typically standard parts are made from the cheapest high carbon steel that can be hardened.
You could proberly compare these to the standard CV vs Cal offroad cv, it would be similar materials.
E110 is a gear steel and 4340 is a cro/mo high tensile, as far as I know longfeilds are 4340.
The material cos on these sector shaft before they are touched is around $160 ea.
I'm just a spanner monkey like most of us on O/L so cannot afford to fund a project like this, but I can get it done with money up front. There is a certain trust involved in this, its just an option for improovement for people I thought I would throw out there.
Steve.
You could proberly compare these to the standard CV vs Cal offroad cv, it would be similar materials.
E110 is a gear steel and 4340 is a cro/mo high tensile, as far as I know longfeilds are 4340.
The material cos on these sector shaft before they are touched is around $160 ea.
I'm just a spanner monkey like most of us on O/L so cannot afford to fund a project like this, but I can get it done with money up front. There is a certain trust involved in this, its just an option for improovement for people I thought I would throw out there.
Steve.
I have been talking with an engineer and it looks like the 4340 is the go. 4340 has a 22% stretch opposed to 8% for the E110.
Cost is around $860 + heat treating, if people are still interested I will keep goin on the quote. The machine shop is booked out til after christmas so there is time to think out your options.
Cost is around $860 + heat treating, if people are still interested I will keep goin on the quote. The machine shop is booked out til after christmas so there is time to think out your options.
this is the type of machine that will be used to make the shafts.
http://www.youtube.com/watch?v=E1Fj1j8S ... ed&search=
http://www.youtube.com/watch?v=E1Fj1j8S ... ed&search=
went to a metalurgist today and after doing some testing have desided to go with 4318. 4318 is a high grade E110 gear steel, these will be case hardened and cryo treated, I have to see another machine shop and hopefully can get the price down quite abit.
The metalurgist has been extensively involved with R&D on a 7000hp drag car.
The 4340 could not be heat treated to an adiquite level to suit the application to meet the properties of the 4318.
The 4340 would have been good bot the 4318 will be better, especially after cryo.
When the 4138 has been case hardened it develops an austinetic structure, due to the high nickel content, the cryo will refine the austinetic structure to give a closer grain and improoved strength.
This is the best way I can explain the process and properties said to me.
The metalurgist has been extensively involved with R&D on a 7000hp drag car.
The 4340 could not be heat treated to an adiquite level to suit the application to meet the properties of the 4318.
The 4340 would have been good bot the 4318 will be better, especially after cryo.
When the 4138 has been case hardened it develops an austinetic structure, due to the high nickel content, the cryo will refine the austinetic structure to give a closer grain and improoved strength.
This is the best way I can explain the process and properties said to me.
Who is online
Users browsing this forum: No registered users and 1 guest