chugga wrote: let me know how much the total cost was.
Ok, here is a quick rundown of what I did.
Cylinders bored 0.5mm oversize and honed
Top of block skimmed
New oversize pistons and rings.
All new bearings in main and big end
Head stripped, cleaned and machined
New valves, valve guides and stem seals.
Rebuild kit included all new gaskets and seals for everything.
New timing belt and tension pulley
New water pump and thermostat.
Injectors cleaned, new seals and o-rings.
New spark plugs. (Coil, dizzy, rotor button, leads all still quite new)
Oil, fuel and air filters.
New idler pulley bearing
New spigot bearing (Clutch & throw-out bearing only about 6 weeks old.)
Starter motor reconditioned (had been playing up for ages so did it while it was apart)
Some rough dollars
About $2000 for rebuild kit, all the machining and valve assembly, timing belt kit, water pump & thermostat.
$30 per injector for clean, o-rings and seals.
Guessing a few hundred for the extra stuff that i did as a piece of mind thing.
Such as water pump, thermostat, fuel filter, air filter etc.
Then the consumables oil, coolant etc.
Overall i think it cost around $2300, But i now have peace of mind that 98% of all the
major components are good as gold and i know the exact condition of all the engine internals.